Projects

Batemans Bay

Batemans Bay

​

Blade manipulator

Blade manipulator

Edwards Heavy Lift were involved in the design, testing and commissioning of the blade manipulator.

Hay Point

Hay Point

Edwards Heavy Lift completed temporary works design and construction methodology for the Hay Point Jetty Deconstruction

Powerhouse Paramatta

Powerhouse Paramatta

Edwards Heavy Lift were involved in several lift planning and temporary works design for the construction of Powerhouse Paramatta. For both the main contractor and crane contractor.